This was our second to the last project in 2005. We removed the stucco, gutted it inside and out, added the roof truss package, and resheathed it with HardiPlank.
This was our second to the last project in 2005. We removed the stucco, gutted it inside and out, added the roof truss package, and resheathed it with HardiPlank.